---
title: "Service requests: doing the repair"
description: "What to do when SureBright sends you a repair job on a system you installed: respond in time, send an estimate, do the work once it is approved, and close the job so you can be paid."
---

Use this page when a service request arrives. You decide whether to take the job, tell SureBright what the repair will take, do the work once it is approved, and close the job with a report. Closing the job is what lets you invoice for it.

## Why you received a service request

A claim on a plan you sold was approved. As the original installer you have the first right to do the repair, and you are paid for the work.

New requests appear under **Service** in the **New Request** tab, and SureBright also emails you. Open a request to see the customer, the affected products, the issue and the time you have left to respond.

## Respond within 24 hours

You have 24 hours from when the request is sent. The request shows the time remaining.

| Choose | What happens |
| --- | --- |
| **Accept** | You take the job and tell SureBright what it needs. |
| **Extend timeline** | You get another 24 hours to decide. You can do this once. |
| **Reject** | You decline, with a reason, and the job is passed on. |

<Warning>
If you do not respond in time, the request is rejected automatically and goes to the next qualified technician in SureBright's network. Your customer is still looked after, but the paid work goes to someone else.
</Warning>

## Where a job sits at each stage

| Tab | What is in it |
| --- | --- |
| **New Request** | Requests waiting for your answer. |
| **Ongoing** | Jobs you accepted. A job shows **Under review** while SureBright looks at your estimate, then moves on as the work progresses. |
| **Completed** | Jobs you marked as done. |
| **Rejected** | Requests you declined, and requests that ran out of time. |

## Accept the job and send an estimate

<Steps>
<Step title="Accept the request">
Select **Accept**. The portal asks **Has the unit been inspected on site?**

- **Yes, inspected**: describe the service needed and say when you can complete the job.
- **Not yet**: say when you will visit the customer. After the visit, open the job and select **Add inspection details**.
</Step>
<Step title="Build the estimate">
Select **Submit estimate** and fill in:

- **Labor cost**: the hours the repair will take and your repair team size. The hourly rate is fixed and already shown, so you do not enter it.
- **Add part**: each part that needs replacing, with its name, quantity and cost. List parts at your own cost. The hint beside **Cost (Per unit)** tells you how to work out the figure to enter.
- Photos or documents that support the estimate: up to 5 files, PDF, PNG or JPEG, 5 MB each.
</Step>
<Step title="Wait for approval">
The job shows **Under review** until SureBright approves the estimate. Some estimates are approved straight away. If an estimate is sent back, update it and submit it again.
</Step>
</Steps>

Do not start work before the estimate is approved. Work done before approval is not paid.

If you cannot source a part, say so, and SureBright arranges it. If the manufacturer supplies the part under its warranty, your estimate covers the labour only.

## When the job changes

| What happened | Do this |
| --- | --- |
| The job will take longer | On the ongoing job select **Extend timeline**, pick a reason and give the new completion date. The time remaining updates once the extension is approved. |
| You found more damage | Ask for additional authorisation before doing the extra work. In **Extend timeline**, answer **Yes** to **Will this bump up the repair cost?**, enter the extra cost and why, and attach photos or documents. SureBright may approve all, part or none of it. |
| The product cannot be repaired | Say so in your estimate, with your assessment. If you find out after the job has started, select **Cancel** on the job, choose **Unit beyond repair** and say whether any work was completed. SureBright decides between a replacement and a reimbursement and tells the customer. |
| The customer is not answering | Select **Extend timeline** with that reason. If they stay unreachable, contact SureBright support. |

## Close the job with a report

When the repair is finished, select **Mark job as done**. This is your closing report. Check the labour time, team size and parts used against the work you did, use **Edit estimation** to correct them, attach your invoice or receipt for the parts, add a note and select **Submit**. The report has to match the approved estimate and any additional authorisation you were given.

SureBright reviews the report. Once it is approved, the job appears under **Invoices** ready to be invoiced. See [Getting paid, and what you are charged](/installers/invoices-and-payouts).

## Decline a request

Select **Reject**, choose the reason and add a note.

- If you have already visited the site, send SureBright your assessment with the rejection. SureBright uses it to route the job and to review payment for the visit.
- You can refer another installer. Give the company name, contact name, email, phone and address.

The repair is then done by the installer you referred or by a qualified technician from SureBright's network. Your customer is told who is handling it.

## Fix common problems

| What you see | What to do |
| --- | --- |
| You missed the response window | The request was rejected automatically and passed on. If you can still take the job, contact SureBright support. |
| The request is outside your service area | Reject it with that reason. Then check your service locations under **Settings** > **Manage stores**, so future requests match where you work. |
| You are not receiving service requests | Check that the store is **Active**, that its service locations cover the areas where you installed, and that your role includes service requests. |
| A job is stuck in **Under review** | SureBright is reviewing your estimate. If it was sent back, update and resubmit it. Otherwise contact support with the request number. |
| You cannot extend a new request again | The response time can be extended once. Accept or reject the request before the time runs out. |
| You cannot find a request | Check the store switcher, then the **Rejected** tab in case it ran out of time. |

## Related

<CardGroup cols={2}>
  <Card title="Claims on a system you installed" href="/installers/claims" icon="shield">
    How the claim behind a request is filed and approved.
  </Card>
  <Card title="Getting paid, and what you are charged" href="/installers/invoices-and-payouts" icon="layers">
    Invoice a closed job and track the payout.
  </Card>
  <Card title="Team, roles and stores" href="/installers/team-and-stores" icon="settings">
    Service locations decide which requests reach you.
  </Card>
</CardGroup>
